Engineering Design Project Samples

Dutchess Community College

DUTCHESS COMMUNITY COLLEGE –Ongoing Services Eisenbach & Ruhnke Engineering, P.C. (E&R) has provided engineering services for the College during the last six years.

E&R has been the Engineer of Record for the College on multiple projects, including capital projects and operating improvements. Responsibilities have included all aspects of building design, construction management and project administration.

A 2011 project was designed and managed by E&R at Bowne Hall. The renovations included replacement/repair of the sanitary sewer and modifications to the reduced pressure zone backflow preventer.

In 2010, E&R completed the design on two electrical projects. One was for Data Center improvements. The other project involved upgrading to a new electrical service throughout the campus, including switch gears and transformers.

Also in 2010, E&R designed and managed a project at Washington Hall to replace the hot water heater.

A 2008 project was designed and managed by E&R to replace boilers in Taconic Hall and the Student Services Building with one system servicing both buildings.

In 2007, E&R designed an abatement project at Dutchess Hall for pipe fittings above ceilings.

Contact Person –
Dominick Giarraputo, Assistant Dean of Administration for Facilities Planning
Dutchess Community College
53 Pendell Road
Poughkeepsie, New York 12601-1595
Phone (845) 431-8652



East Ramapo Central School District

East Ramapo Central School District –Ongoing Services Eisenbach & Ruhnke Engineering, P.C. (E&R) has provided engineering services for the District over the last 22 years.
E&R has been the Engineer of Record for the District on multiple projects, including capital projects, environmental responses, energy performance contracts and operating improvements. Responsibilities have included all aspects of building design, SED document submittal, construction management and project administration.

The projects have included boiler and HVAC equipment replacement, window and roof replacement, science room renovations, asbestos remediation and building restoration and other building renovations.

E&R services have also included testing, consulting and designing abatement and management of hazardous materials during the renovations and as part of the on-going building management. Hazardous materials included asbestos, polychlorinated biphenyls (PCBs) and lead-based paint.

E&R currently has a term contract with the District to provide all engineering services for building renovations and there are several projects in process.

Total Combined Project Construction Cost    $50,000,000.00
Project Duration                                          22 years

Contact Person – Richard Haswell, Director of Facilities*
East Ramapo Central School District
557 New Hempstead Road
Spring Valley, NY 10977
(845) 577 6480

* Mr. Haswell is currently out due to an illness. Another reference would be Roy Belser, who was the Director of Facilities until last year and is now at the Ramapo Central School District. His phone number is (845) 222-8208.


Warwick Valley Central School District

WARWICK VALLEY CENTRAL SCHOOL DISTRICT –Ongoing Services Eisenbach & Ruhnke Engineering, P.C. (E&R) has provided engineering services for the District during the last two years.

E&R has been the Engineer of Record for the District on multiple projects, including capital projects, an energy performance contract and operating improvements. Responsibilities have included all aspects of building design, SED document submittal, construction management and project administration.

During 2011/2012, five projects were designed and either constructed or under construction including a new district wide IT system, replacement of fire alarm systems in 4 buildings, renovations at the High School, exterior door replacement, replacement of ceilings and flooring in the Middle School, replacement of HVAC equipment in the Middle School and miscellaneous other repairs.

During 2012, work was done at the Park Avenue Elementary School to reduce overheating, improve ventilation and upgrade the windows. Further, an observatory has been designed that is being built as a community project.

An energy performance contract has been designed and is awaiting SED approval.

E&R services have also included testing, consulting and designing abatement and management of hazardous materials during the renovations and as part of the on-going building management. Hazardous materials included asbestos, polychlorinated biphenyls (PCBs) and lead-based paint.

Total Combined Project Construction Cost       $12,000,000.00
Project duration                                                2 years

Contact Person – Timothy Holmes, Assistant Superintendent for Business
Warwick Valley CSD
225 West Street Extension
P.O. Box 595
Warwick, New York 10990
Phone (845) 987-3000 X10521


Experience List >     |     Service Information >

 
Copyright ©, All Rights Reserved,    Eisenbach & Ruhnke Engineering, P.C.

Home        |       About Us        |       Our Services        |       Experience        |       Contact Us        |       top of page